In the Philippines, the project covers 4 sites in the province of Iliolo: Bagongon, Loong, North Bacjawan, Tambaliza. The document presents the progress of the project in the various components:
– Installation of green and grey infrastructures: In each of the sites, combining soft solutions (mainly bamboo structures) and grey solutions (small stone dikes) to trap sediment and mitigate swell before reforestation.
– Development of alternative livelihoods in demonstration sites
– Promotion of green-grey solutions at local, national and international level
COVID has stopped most of the activities.
Photos: 1: Sediment trap (Bagongon); 2: Wave attenuation structures (Bagongon); 3 and 4: Grey solutions (Northern Bacjawan); 5, 6 and 7: Farm in Tambaliza
> Download the report